How to Get a Separate Address for an ADU

Small home with its own entry deck and signboard, the kind of ADU that needs a separate address

The short answer: An ADU’s address is assigned by the local addressing office, usually your city or county building department, and most often as part of the building permit. San José assigns an address to every ADU and JADU during the permit process and charges $454 with a two-hour minimum per addressing request; San Diego … Read more

Saving for an ADU: A Budget Timeline That Works

Dark modern home with a wood deck, the goal at the end of an ADU savings plan

The short answer: Even if a loan will pay for construction, most ADU owners need cash first: for design, engineering, a soils report, permit fees and a reserve for surprises. Architect design alone typically runs $10,000 to $25,000 for a standard detached ADU, or about $2,000 to $5,000 with a city’s pre-approved plan. Divide your … Read more

ADU Insurance: What Changes in Your Home Policy

Two-story white home with blue shutters, a property whose insurance changes once an ADU is added

The short answer: Building an ADU changes what your insurance has to cover, and renting it changes it again. Standard homeowners policies generally cover detached structures for about 10% of the insurance on the house, which may be far less than a new ADU costs. Triple-I also warns that a standard policy may not cover … Read more

How an Appraiser Values a Home With an ADU

Modern home with metal siding and wood accents, the kind of ADU an appraiser has to value

The short answer: An appraiser values an ADU separately from the main house. Under Fannie Mae’s guidelines, the ADU’s living area is not added to the home’s above-grade square footage; it is reported and adjusted on its own line, supported by comparable sales. The appraiser must analyze the ADU’s effect on value and marketability. A … Read more

Building an ADU in a Historic District: What Changes

California bungalows in the Highland-Camrose historic district in Hollywood

The short answer: You can usually build an ADU in a historic district, but expect design rules. In California, cities can apply objective standards that prevent adverse impacts on properties listed in the California Register of Historical Resources, and they cannot require any parking for an ADU in a historic district. Colorado still allows public … Read more

ADUs in the California Coastal Zone: Permits and Timing

Homes along the Venice Canals in Los Angeles, inside the California coastal zone

The short answer: In California’s coastal zone, an ADU usually needs a coastal development permit as well as a building permit, because state ADU law does not weaken the Coastal Act. Government Code section 66329 speeds it up: the local government must approve or deny the coastal permit within 60 days of a complete application, … Read more

Basement ADU: Rules for Converting a Basement

Brick house with a raised foundation, the kind of home with a basement that could become an ADU

The short answer: A basement is one of the easiest places to add an ADU, because the space already exists inside the home. In California, a city must ministerially approve an ADU within the existing space of a single-family home, with exterior access, and it needs no parking. The Energy Commission treats converting existing conditioned … Read more

Building an ADU for Aging Parents: Costs, Taxes, Plans

Cozy cottage framed by climbing roses, the feel of a small home built for aging parents

The short answer: An ADU lets a parent live close by with their own front door. Choose between a JADU inside your home, usually the cheapest, and a detached ADU with more privacy. On taxes, two IRS rules matter: if your parent pays less than a fair rental price, their use counts as personal use … Read more

ADU vs Home Addition: Cost, Rules and Value Compared

Large white house with a side wing, illustrating the choice between an addition and an ADU

The short answer: An addition makes your home bigger; an ADU creates a second home on the lot. In California, that difference changes the rules. An ADU application must be approved ministerially within 60 days of a complete application, with side and rear setbacks capped at 4 feet and no impact fees at 750 sq … Read more

ADU Site Prep and Foundation Costs, Explained

Crew working on the base and exterior of a small home, the site prep stage of an ADU

The short answer: The ground under an ADU can move the budget more than the finishes inside it. A June 2026 California builder guide puts a standard slab foundation at $15,000 to $25,000, while an engineered pier-and-beam or deep-pile foundation runs $35,000 to $85,000. Before anyone pours concrete, a soils (geotechnical) report costs $2,500 to … Read more