Sacramento ADU Rules: What the City Allows

The short answer: Sacramento ADU rules let you choose between two frameworks. Under the local ordinance you can build up to two ADUs in any mix of attached, detached or Junior ADU (JADU), with detached units up to 1,200 sq ft. Under state standards you can build up to three: a converted ADU, a JADU and an 800 sq ft detached ADU with 4-ft setbacks. Impact fees are waived for ADUs under 750 sq ft.

Last verified: October 28, 2026 · Written by Marc

This guide covers the City of Sacramento. Sacramento County and neighboring cities such as Elk Grove have their own rules. The numbers come from the city’s ADU planning page and its handout (revised January 29, 2026).

Sacramento ADU rules: where ADUs are allowed

ADUs are allowed on residential lots in the city, subject to overlay zones such as EA-2 and EA-3 and to the city’s historic design standards. Properties in the EA-2 or EA-3 overlay zones are limited to one ADU per lot. Historic districts allow ADUs if they follow the city’s design standards.

Sacramento ADU rules: local ordinance or state standards

RuleLocal ADU ordinanceState standards (single-unit lot)
NumberUp to 2, in any combination of attached, detached or JADUUp to 3: one attached conversion, one JADU, one detached
Detached sizeUp to 1,200 sq ft; two detached ADUs combined cannot exceed 1,200 sq ftNot more than 800 sq ft
Attached size50% of the main home or 850 sq ft (1,000 sq ft with 2+ bedrooms), whichever is greaterA conversion can expand by up to 150 sq ft
JADU500 sq ft500 sq ft
HeightFollows the zone’s limit (R-1 example: 35 ft)18 ft, plus 2 ft to match a roof pitch
Side and rear setbacks3 ft minimum, for ADUs less than 60 ft from the front property line4 ft minimum

The state’s own baseline height is 16 ft, with 18 ft allowed near major transit. The city’s page lists 18 ft for state-standard ADUs, so ask which allowance applies to your lot.

Sacramento ADU rules on fees

  • Impact fees are waived for ADUs under 750 sq ft and apply to units of 750 sq ft and larger.
  • School district impact fees are charged separately.
  • The city publishes a fee estimate form (CDD-0419) so you can price a project before you apply.

See ADU impact fees for the statewide rules.

Step by step: the city’s seven-step process and timeline

Seven-step Sacramento ADU process from checking eligibility to occupancy, with submittal items and the city's free Shelf Ready plans
Source: City of Sacramento ADU resource site. Diagram by AduNorth.

The city runs a dedicated ADU site that walks you through seven steps:

  1. Check whether an ADU is allowed on your property.
  2. Set goals and build a team.
  3. Prepare the site plan and design.
  4. Set a budget.
  5. Submit the application.
  6. Build and pass inspections.
  7. Occupy or rent the unit.

Under state law, the city has 15 business days to check completeness and 60 days to decide on a complete application.

Step 2 lists the ADU types the city recognizes: detached, interior conversion, above-garage conversion, attached addition, garage conversion and modular or pre-manufactured. Step 3 asks for a fully dimensioned site plan drawn to scale, which can be digital or hand-drawn. It must show lot lines, existing structures, impervious surfaces, the proposed ADU and its distances to the property lines.

At submittal (step 5) the city lists the following:

  • Construction documents for the building permit.
  • An Address Request Form (CDD-0104). A new address is required, and the city says getting it can take up to four weeks.
  • A tree permit if you remove trees.
  • Optionally, an ADU Optional Zoning Review application (CDD-0009). The city says no separate planning or zoning approval is required before you apply for the building permit.

The city’s own review estimates, which exclude the time you take to respond, are 1 to 3 weeks for the optional zoning review and about 1.5 to 2 months for building plan review, split into review cycles of 20, 15 and 5 business days. These are service estimates. The state deadlines described above, 15 business days for completeness and 60 days to decide, are separate legal limits. Before you can occupy the unit it must pass a series of inspections, and the city warns that material and labor shortages can add costs and delays.

What the city says about budgeting

The city’s budget step says the optional zoning review costs $0, building permit fees are based on project valuation and include inspection and impact fees, and plan review fees vary. Per state law, impact fees are waived for an ADU of 749 sq ft or less. Additional fees are invoiced when you pick up the permit. As a rule of thumb the city puts construction at about 80% of an ADU budget and consulting, design and permits at about 20%. The pages we read publish no dollar amounts for plan check, water and sewer capacity or school fees, so use the fee estimate form to price your project (see the fees section above) and read ADU permit cost by city for how this compares with other cities.

Shelf Ready Plans

The city offers free, city-designed plans for detached ADUs in three sizes: a 367 sq ft studio, a 559 sq ft one-bedroom and a 747 sq ft two-bedroom. They meet the 2022 Residential Building Code, are all-electric, and cannot be modified. You still have to submit a site plan for your lot. The Building Division also runs a pre-approved program under AB 1332: anyone can submit a detached ADU plan for pre-approval, approved plans are posted on the city’s website, and each still needs site-specific design and permitting approval, including planning and zoning, before a permit is issued.

Sacramento ADU rules on utilities and site constraints

  • Water: a detached ADU may have its own domestic water service and meter, which costs more up front, or tie into the existing line. An attached ADU must connect to the existing domestic water line. The city says sub-metering may be possible if the ADU is a long-term rental.
  • Sewer: your property is served by either the Sacramento Area Sewer District or the city. The city says sewer billing for the ADU is combined with the main residence.
  • Stormwater: if the net increase in impervious area is more than 500 sq ft, you need onsite detention.
  • Electric: SMUD is the electric provider, and the city advises contacting SMUD early.

For how these rules compare with other California cities, see our guide to utility meters for ADUs.

Parking, owner occupancy and rentals in the city code

The city handout does not discuss parking, but the city code does. Section 17.608.020.L, added by Ordinance 2024-0017 (effective July 25, 2024), says that when parking is removed in connection with building an ADU or JADU, no replacement parking is required for the ADU or for the other homes on the lot. For JADUs, state law settles it: a city cannot require additional parking as a condition of a JADU permit (Gov. Code § 66334(a)).

For owner occupancy, city code section 17.228.105 requires the owner to live on site for a JADU unless a government agency, land trust or housing organization owns it. In a January 20, 2026 review letter, the state housing department (HCD) told Sacramento that this has to match state law, under which owner occupancy is required only if the JADU shares sanitation facilities with the main home. For a full ADU on a single-family lot, state law bars an owner-occupancy requirement altogether (Gov. Code § 66315).

On rentals, the city handout says an ADU can be rented but not sold separately, and the city’s step 7 says rentals must follow its Tenant Protection Program and fair-housing law. Rules on rentals shorter than 30 days differ between the local and state frameworks in the ordinance, so read section 17.228.105 before you plan any short-term use.

Why the rules may change in 2026

The same HCD letter lists changes it expects Sacramento to make, including incorporating recent state laws (AB 130, AB 462, AB 1154, SB 9 and SB 543), allowing the full combination of units that state law gives each lot, and revising the multifamily allowance. The city may amend its ordinance in 2026, so check the city’s ADU site for the version in force when you apply.

Ask the city before you design

Confirm with the Community Development Department whether the city has amended its ADU code since HCD’s January 2026 letter, how its short-term rental rules apply to your unit, and any flood-zone requirements for your lot.

Practical tip: Fill in the city’s fee estimate form (CDD-0419) before you meet the city, and bring it with your site plan. You will get more precise answers, and you will see early whether staying under 750 sq ft saves you the impact fees.

FAQ

Which framework is better?

Neither is always better. The local ordinance allows up to two ADUs, with detached units up to 1,200 sq ft and attached units up to 50% of the home or 850 sq ft, whichever is greater. State standards allow up to three units on a single-unit lot: a conversion, a JADU and an 800 sq ft detached ADU with 4-foot setbacks. Choose the one that fits your lot.

Can I build in a historic district?

Yes. Historic districts in Sacramento allow ADUs if they follow the city’s design standards for historic properties, so expect the design to be checked against them. Properties in the EA-2 or EA-3 overlay zones have a separate limit: one ADU per lot. Ask the city which standards apply to your parcel before your designer starts work.

Do I need a separate address?

Yes. Each ADU needs its own address. You request it with the city’s Address Request Form (CDD-0104) as part of the submittal, and the city says getting it can take up to four weeks. Request it early so it does not hold up the permit, the utility accounts or mail for your tenant.

Is parking required for a Sacramento ADU?

Not as replacement parking. City code section 17.608.020.L, effective July 25, 2024, says that when parking is removed to build an ADU or JADU, no replacement parking is required for the ADU or for the other homes on the lot. For a JADU, state law bars cities from requiring additional parking. The city handout does not cover parking, so cite the code section if a reviewer asks.

The bottom line

Sacramento ADU rules give you two frameworks. The local ordinance allows up to two ADUs, with detached units up to 1,200 sq ft. State standards allow up to three units, including an 800 sq ft detached ADU. Impact fees are waived under 750 sq ft, the city offers free Shelf Ready plans in three sizes, and HCD’s January 2026 letter means the ordinance may change.

Your next step is to check your parcel for EA-2 or EA-3 overlays and historic standards, then price the project with the city’s fee estimate form. Compare the fees in ADU permit cost by city and the review time in how long an ADU permit takes in California.

General information, not legal advice. Local rules vary and change; confirm with your planning department.

Sources: City of Sacramento, Step 1: Is an ADU Allowed on My Property? · City of Sacramento, ADU handout (CDD-0423, revised January 29, 2026) · HCD ADU Handbook · City of Sacramento, ADU utilities and additional considerations · City of Sacramento, Shelf Ready Plans · HCD, Sacramento ADU ordinance review letter (January 20, 2026)

Questions or a correction?

If something in this guide is unclear, out of date or does not match what your city told you, send me a message. Include the source if you have one.